1.Verification
performed without any executable code is referred to as
a) Review
b) Static testing
c) Validation
d) Sanity testing
2.If
Quality Control and Quality Assurance are compared
a) Both are literally the same
b) QA is a higher activity in the
management Hierarchy
c) QC ia a higher activity in the
management Hierarchy
d) QA is done by the client and QC si
done by the software vendor
3.The
extent of automation for a given project is generally guided by
a) Scope for automation
b) Tool support
c) Business Functionality
d) Vendor's skills
4.Test
data planning essentially includes
a) Network
b) Operational Model
c) Boundary value analysis
d) Test Procedure Planning
5.Which
of the following is not a client side statistics in load testing
a) Hits per second
b) Throughput
c) Cache hit ratio
d) Transaction per second
6.Feasibility
study is more imoprtant before load testing
a) Web Applications
b) Client-server applications
c) Mainframe applications
d) Citrix applications
7.Which
one of the following need not be part of the bug tracker?
a) Bug identifier
b) One line bug description
c) Severity of the bug
d) None of the above
8.Which
of the following approach needs to be taken if there are a large number of
defects being found in the software?
1. Try continuing testing and logging
the critical defects.
2. Immediately stop testing the
product.
3. Inform the lead/manager providing
proper documentation
4. Continue testing in the normal
manner
a) 1 and 3
b) 3 and 4
c) 2 only
d) 3 only
9.What
if the application has functionality that wasn't in the requirements?
a) Ignore testing that functionality
b) Continue to test the functionality
and report the results
c) Update the Project Manager with the
details and the risk involved
d) None of the above
10.What
are the key features to be concentrated upon when doing a testing for
world
wide web sites
a) Interaction between html pages
b) Performance on the client side
c) Security aspects
d) All of
the above
11.What
if the project isn't big enough to justify extensive testing?
a) Use risk
based analysis to find out which areas need to be tested
b) Use automation tool for testing
c) a and b
d) None of the above
12.The
selection of test cases for regression testing
a) Requires knowledge on the bug fixes
and how it affect the system
b) Includes the area of frequent
defects
c) Includes the area which has
undergone many/recent code changes
d) All of
the above
13.What
are the main attributes of test automation
1. Time saving
2. Correctness
3. Less Manpower
4. More reliable
a) 1 and 2
b) 2 and 3
c) 1, 2 , 3
and 4
d) None of the above
14.Some
of the common problems of test automation are
a) Changing requirements
b) Lack of time
c) Both a
and b
d) None of the above
15.Some
of the metrics which are collected in a testing project are
Productivity
Test
effectiveness
Requirement
stability
Bug fix
rate
a) 1 and 2
b) 2 and 3
c) 1,2, and 4
d) 1 and 4
16.Test
Suit Manager
a) A tool that specifies an order of
actions that should be performed during a test session
b) A software package that cretes test
transactions for testing application systems and programs
c) A tool that allows testers to
recognize test script by function or other grouping
d) None of the above
17.Baseline
means
a) A single software product that may
or may not fully support a business function
b) A quantitative measure of the
current level of performance
c) A test or analysis coducted after
an application is moved into production
d) None of the above
18.A
document describing any event during the testing process that requires
investigation
a) Test log
b) Test Incident report
c) Test Cycle
d) Test Item
19.The
purpose of this event is to review the application user interface and other
human factors of the application with the people who will be using the
application.
a) User Acceptance test
b) Usablity test
c) Validation
d) None of the above
20.What
is used to measure the characteristics of the documentation and code?
a) Process metrics
b) Product metrics
c) Software Quality metrics
d) None of the above
21.Use
of an executable model to represent the behavior of an object is called
a) Simulation
b) Software item
c) Software feature
d) None of the above
22.Benchmarking
is
a) Comparing
your company’s products services
or processes against
best
practices or competitive practices to help define superior
performance
of a product service or support process.
b) A quantitative measure of the
current level of performance
c) A test or analysis conducted after
an application is moved into production
c) None of the above
23.Recovery
testing is a system test that forces the software to fail and verifies that data
recovery is properly performed.
The
following should be checked for correctness
1.
Re-initialization
2.
Restart
3. Data
Recovery
4.
Check Point Mechanism
a) 1 and 2
b) 1, 2 and 3
c) 1, 2, 3
and 4
d) 2 and 4
24.UAT
is different from other testing types normally because of
a) Data
b) Cycles
c) Defects
d) None of the above
25.Alpha
testing is differentiated from Beta testing by
a) The
location where the tests are conducted.
b) The types of test conducted
c) The people doing the testing
d) The degree to which white box
techniques are used
26.
What is the need for test planning
a) to
utilize a balance of testing techniques
b) to understand testing process
c) to collect metrics
d) to perform ad hoc testing.
27.
Which of the following is NOT a part of Test plan document?
a. assumptions
b) communication approach
c) risk analysis
d) status report
28.
Which part of Test plan will define 'What will and will not be covered in the
test'?
a) test scopt
b) test objective
c) both a & b
d) none of the above
29.
Test objective is simply a testing
a) direction
b) vision
c) mission
d) goal
30.
Which out of the below is NOT a concern
for testers to complete a test plan
a) not enough tranining
b) lack of test tools
c) enough time for testing
d) rapid change
31.The
effort taken to create a test plan shoule be
a) half of the total test effort
b) one-third of the total test efforts
c) two times of the total test effort
d) one-fifth of the total test effort
32.What
do you mean by 'Having to say NO'
a) No, the problem is not with testers
b) No, the software is not ready for
production
c) Both a and b
d) none of the above
33.Tools
like change Man, Clear case are used as
a) functional automation tools
b) performance testing tools
c) configuration management tools
d) none of the above
34.In
Life cycle approach to testing, test execution occurs
a) during testing phase
b) during requirement phase
c) during coding phase
d) none of the above
35. Who
is responsible for conducting test readiness review?
a. Test
manager
b. Test engineer
c. both A & B
d. Project Manager
36.
What is NOT a test log?
a. Maps the
test results to requirements
b. Records test activities
c. Maintains control over the test
d. Contains pass or fail results.
37.
When Integration testing should begin
a. during black-box testing
b. once unit
testing is complete for the integrating components
c. Before unit testing is complete
d. All of the above
38.
Which is NOT a part of integration testing
a. Validation of the links between the
clients and server
b. Output interface file accuracy
c. back-out situations
d. none of
the above.
39.
When to stop testing?
a. When all
quality goals defined at the start of the project have been
met.
b. When running short of time
c. When all test cases are executed
d. all the above
40.
Authorization _________
a. compliance testing
b. disaster testing
c. verifying
compliance to rules
d. functional testing
e. ease of operationsAnswers:
Q.1-B
Q.2-C
Q.3-A
Q.4-C
Q.5-C
Q.6-A
Q.7-D
Q.8-A
Q.9-C
Q.10-D
Q.11-A
Q.12-D
Q.13-C
Q.14-C
Q.15-C
Q.16-C
Q.17-B
Q.18-B
Q.19-B
Q.20-B
Q.21-A
Q.22-A
Q.23-C
Q.24-A
Q.25-A
Q.26-A
Q.27-D
Q.28-A
Q.29-D
Q.30-C
Q.31-B
Q.32-B
Q.33-C
Q.34-D
Q.35-A
Q.36-A
Q.37-B
Q.38-D
Q.39-A
Q.40-C
Q2 the ans B Because QC is a part of QA
ReplyDeletecorrect me if i am wrong
The best Answer is C because Verification is an example of QA and Validation/Software Testing is an example of QC
Deletecould anyone please explain q17.
ReplyDeleteCan someone please explain Q17. As per ISTQB glossary "BASELINE " means A specification or software product that has been formally reviewed or agreed upon, that thereafter serves as the basis for further development, and that can be changed only
ReplyDeletethrough a formal change control process. Please clarify why option( b) is ans??? As per me it should be (d).
Q34
ReplyDeleteDuring testing phase we execute test cases so I don't understand why A is not an answer.
Please explain.
ReplyDeleteVery Good Blog. Highly valuable information have been shared.Great information has been shared. We expect many more blogs from the author. Special thanks for sharing..
software testing services
software testing companies
Regression testing services
Performance testing Services
Test automation services
Nice Post.. really helpful to clear my small concepts. thanks :)Keep doing more, waiting to read your next blog.
ReplyDeletequality assurance and testing services
Software testing and Quality Assurance Services
Software testing companies in USA
End to end Performance testing services in USA
Performance testing services company
security testing services company
Test automation service providers
QA Services company
mobile app testing services
This comment has been removed by the author.
ReplyDeleteAnswer of the 4 question is c or d ? Some sites are saying that its Test Procedure Planning not Boundary Value Analysis
ReplyDeleteThe success of a test automation company largely depends on the tools and technologies it employs. At Kualitatem, we utilize a wide array of advanced automation tools and frameworks to deliver exceptional test automation services.
ReplyDelete